The grid pool is capped. Energize anyway.
BC Hydro's 2026 Call for Demand opened just ~400 MW of new capacity for data centres — heavily oversubscribed, capped at 145 MW per project. Applications closed March 9, 2026, and successful bidders won't be named until around September 2026. Whether you're waiting on that decision, already know you won't get the capacity you need, or missed the window entirely, a grid connection is no longer the only way to power your campus.
What the Call for Demand actually allocated
You may be stranded if…
- You applied to the 2026 Call for Demand and are waiting on — or did not receive — an allocation.
- Your project needs more than the 145 MW per-project ceiling.
- You entered BC Hydro's interconnection queue after the eligibility cut-off, or missed the March 9 window.
- Your load is real and financeable, but the grid capacity simply is not there for years.
The behind-the-meter answer
GRECO builds the power the grid can't give you in time — and turns your load into a grid and community asset.
Behind-the-meter generation
On-site power on your side of the meter — so the campus energizes on your timeline, not the utility's multi-year queue.
Grid-scale storage
Lithium and vanadium-flow storage firm the load and let compute flex against grid signals — a grid asset, not a grid burden.
District-heat export
Recovered 50 °C heat metered into neighbourhood energy — the community-benefit and environmental outcome BC's process rewards.
Still aligned with what BC rewards
BC evaluates projects on data sovereignty, jobs, environmental impact, community benefit and First Nations involvement. An energy-first campus meets those criteria whether the electrons come from the grid, on-site generation, or both.
Environmental impact
Clean power stacks + ~97% heat recovery that displaces gas heating in nearby buildings.
Community benefit & First Nations
Heat export to local district energy, and equity-partnership models aligned with BC's allocation priorities.
Data sovereignty & jobs
Canadian-sited, Canadian-operated campuses with local construction and operations employment.